Desarrollo San Pablo
Diaza: Clear height for a vertical manufacturing process
The Diaza project combines offices and plastics manufacturing at Desarrollo San Pablo, with a reported area of 1,895.88 m². The project record lists it as under construction; the photograph documents a stage of the work.

The challenge
Accommodate a plastics manufacturing process that requires internal height.
The approach
The facility was designed with 13.5 m of clear internal height to support the vertical manufacturing process. Grupo COB’s scope includes design, engineering, permitting, construction and building services.
Clear internal height: 13.5 m
Grupo COB’s scope
- Design
- Engineering
- Permitting
- Construction
- Building services