Skip to main content
Get a quote
ES
← Services

Industrial building engineering in Querétaro

Explore the engineering decisions behind the clear height at Diaza and the coordinated warehouse floor level at 48C.

Interior of the Diaza facility during construction
Diaza · Desarrollo San Pablo · Structure and interior during construction.

Which dimension matters to the operation?

Diaza’s plastics manufacturing process needed vertical space. The design provides 13.5 m of clear internal height. At 48C, the critical dimension was the floor level. Matching the adjoining warehouses left open the option of using them together.

What to bring to the discussion

Start with the equipment that takes up the most space and the most demanding handling movement. Dimensions, weight and access needs help the structural and building services teams decide what to study.

Projects to compare

Further reading

Discuss my project with Grupo COB